首页 | 本学科首页   官方微博 | 高级检索  
     

碾压混凝土双曲拱坝连续施工混凝土入仓方案的选择
引用本文:陈世达. 碾压混凝土双曲拱坝连续施工混凝土入仓方案的选择[J]. 企业科技与发展, 2011, 0(5): 53-55
作者姓名:陈世达
作者单位:广西老科协水电工程局分会,广西南宁530001
摘    要:碾压混凝土双曲拱坝是一种新型的拦河大坝,其具有连续施工速度快,技术先进,投资节省的特点。文章就那恩水电站碾压混凝土双曲拱坝的实际状况,对大坝混凝土入仓方案的选择进行了探讨,对于在山区建造的中小型水电站拦河大坝施工有一定的参考价值。

关 键 词:水电站  碾压混凝土双曲拱坝  混凝土入仓方案

How to Choose Concrete Warehousing Plan for Continuous Construction of Roller Compacted Concrete Double-curvature Arch Dam
CHEN Shi-da. How to Choose Concrete Warehousing Plan for Continuous Construction of Roller Compacted Concrete Double-curvature Arch Dam[J]. , 2011, 0(5): 53-55
Authors:CHEN Shi-da
Affiliation:CHEN Shi-da (Hydropower Engineering Bureau of Guangxi Association of Senior Scientists and Technicians,Nanning Guangxi 530000)
Abstract:Roller compacted concrete double-curvature arch dam is a new type of river dam.Its characteristics contain rapid continuous construction,advanced techniques,economic investment.The paper focuses on the current situation of the roller compacted concrete double-curvature arch dam in Na'en Hydropower Station,discussing the choices of concrete warehousing plan,providing some reference for building small and medium-sized hydropower station dams in mountainous areas.
Keywords:hydropower station  roller compacted concrete double-curvature arch dam  concrete warehousing plan
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号