首页 | 本学科首页   官方微博 | 高级检索  
     检索      

拉日铁路扩能改造方案研究
引用本文:方华.拉日铁路扩能改造方案研究[J].铁道运输与经济,2019(4):47-51,126.
作者姓名:方华
作者单位:中铁第一勘察设计院集团有限公司陕西省铁道及地下交通工程重点实验室
基金项目:中国铁建股份有限公司科研开发项目(14-c53)
摘    要:随着中尼、中印铁路引入西藏自治区路网规划,2030年拉日铁路通道功能的进一步加强及运量的快速增长,既有能力已远远不能满足日益增长的运输需求,提高线路能力迫在眉睫。通过对既有铁路技术标准和运营现状的分析,根据近、远期客货运量预测特点,通过采用改造牵引种类、提高牵引质量、增开预留车站、增建二线等措施,从改建目标、分段改建原则及改建方案3个角度,对维持内燃牵引情况下延长全部车站到发线有效长、局部区段复线,以及进行电气化改造情况下延长到发线有效长度、局部区段增建二线扩能方案进行方案比选研究,以达到挖潜扩能,使通道能力与运输需求相匹配的目标,最后,提出拉日铁路扩能改造的建设时序。

关 键 词:拉日铁路  扩能改造  运量预测  运输能力  改建方案

A Research on Capacity Expansion Scheme of Lasa to Shigatse Railway
FANG Hua.A Research on Capacity Expansion Scheme of Lasa to Shigatse Railway[J].Rail Way Transport and Economy,2019(4):47-51,126.
Authors:FANG Hua
Institution:(Shaanxi Railway and Underground Traffic Engineering Key Laboratory,China Railway First Survey and DesignInstitute Group Co.,Ltd.,Xi’an 710043,Shaanxi,China)
Abstract:With the introduction of Sino-Nepalese and Sino-Indian railways into the railway network planning of Tibet Autonomous Region, the function of Lasa to Shigatse railway corridor has been further strengthened, and the traffic volume will increase rapidly in 2030. The existing capacity is far from meeting the increasing transport demand, therefore it is urgent to improve the line capacity. Based on the analysis of technical standards and operation status of existing railways, according to the characteristics of passenger and freight volume forecast in different research years, from the perspective of reconstruction objectives, principles of sectional reconstruction and reconstruction schemes, this paper adopts such measures as retrofitting traction types, improving traction quality, opening more reserved stations and building more second lines to prolong the effective length of all stations to departure lines under the condition of maintaining internal combustion traction and local multi-line. In the case of electrified transformation, the effective length of the transmission line is extended, and the capacity expansion scheme of the second line is built in the local section for comparison and study. The purpose is to tap the potential and expand the capacity, so as to match the capacity of the corridor with the transport demand, and finally put forward the construction schedule of the expansion and transformation of the Lasa-Shigatse Railway.
Keywords:Lasa-Shigatse Railway  Capacity Expansion  Traffic Volume Forecast  Transportation Capacity  Renovation Scheme
本文献已被 CNKI 维普 等数据库收录!