首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Robust and stable multi-task manufacturing scheduling with uncertainties using a two-stage extended genetic algorithm
Abstract:ABSTRACT

In cloud manufacturing (CMfg), unexpected uncertainties can occur in real-world manufacturing processes that could make the predetermined schedule infeasible. A new multi-objective proactive method is proposed in this situation to evaluate the proactive schedule. A novel two-stage extended genetic algorithm (2S-EGA) is proposed to generate proactive schedules that consider service interruptions. The experimental results confirmed that the obtained proactive schedule produces great performance when applied to multi-task scheduling problems with service interruptions. Furthermore, the results also showed that the proactive schedule obtained by the proposed approach is more robust and stable than other baseline algorithms taken from the literature.
Keywords:CMfg  flexible multi-task scheduling  uncertainties  robustness and stability  proactive schedule  2S-EGA
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号