首页 | 本学科首页   官方微博 | 高级检索  
     检索      


How far is how far enough? Safety perception and acceptance of extra-high-voltage power lines in Germany
Authors:Peter M Wiedemann  Franziska Boerner  Frank Claus
Institution:1. School of Psychology, University of Wollongong, Wollongong, Australia;2. Institute for Technology Assessment and Systems Analysis (ITAS), Karlsruhe Institute of Technology, Karlsruhe, Germany;3. IKU, Dortmund, Germany
Abstract:The results of a 2?×?2 factorial online experiment are reported. The first factor refers to the information on precautionary measures and the second factor on the information regarding the share of EMF exposure from extra-high-voltage power lines compared to overall EMF exposure measured in-house. The study is based on a community sample of 440 subjects. Information on the share of EMF exposure from extra-high-voltage power lines at the in-house overall EMF exposure has no statistically significant effect of safety distances and acceptance distances. Further findings indicate that communications of precautionary measures produce a countervailing effect: on average, subjects require a higher distance from their homes compared to those who were not informed about precautionary measures. However, there is also a positive effect of precautionary information on the acceptance belief. Subjects who received this information are, in average, less negative about the claim that compliance with the value limit is sufficient in order to agree with the construction of a power line. Possible explanations of the findings such as cognitive dissonance, negativity bias, and style of information processing are discussed.
Keywords:power lines  acceptance  safety perception  precautionary information
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号