首页 | 本学科首页   官方微博 | 高级检索  
     

桥巩水电站工程金属结构设计
引用本文:宾仕勋. 桥巩水电站工程金属结构设计[J]. 红水河, 2012, 0(4): 71-75,78
作者姓名:宾仕勋
作者单位:广西电力工业勘察设计研究院
摘    要:文章介绍桥巩水电站工程金属结构的设计成果、启闭机的选型、闸门的结构设计特点及门槽设计的新思路和方法。目前电站已运行多年,闸门和启闭设备运行良好,证明设备选型正确、布置合理、设计是合理、可靠的。

关 键 词:金属结构  拦污栅  闸门  启闭机  布置  桥巩水电站

Metal Structure Design of Qiaogong Hydropower Station
BIN Shi-xun. Metal Structure Design of Qiaogong Hydropower Station[J]. Hongshui River, 2012, 0(4): 71-75,78
Authors:BIN Shi-xun
Affiliation:BIN Shi-xun (Guangxi Electric Power Industry Investigation Design and Research Institute, Guangxi,Nanning,530023)
Abstract:The paper makes an introduction to the design result of metal structure,the type selection of hoist,the structural design characteristics of gate as well as new ideas and methods for gate slot design of Qiaogong hydropower station.Currently,the gate and the hoist run very well through years running test,which proves that these equipments are in correct type selections,reasonable arrangements and with reasonable and reliable designs.
Keywords:metal structure  trash rack  gate  hoist  arrangement  Qiaogong hydropower station
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号