首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于模糊综合评价法的武器装备研制进度风险评估
引用本文:徐健.基于模糊综合评价法的武器装备研制进度风险评估[J].价值工程,2014(1):314-315.
作者姓名:徐健
作者单位:海军驻沈阳地区发动机专业军事代表室,沈阳110043
摘    要:按照模糊综合评价的方法,将评价结果中的风险因素进行了排序,探索出了该方法在武器装备研制进度风险中应用的途径,针对性地识别和解决了高风险问题,可对武器装备研制过程中的风险点选取提供参考。

关 键 词:模糊综合评价法  研制进度  风险评估  武器装备

Risk Evaluation of Weapon System Development Schedule Based on Fuzzy Comprehensive Assessment
XU Jian.Risk Evaluation of Weapon System Development Schedule Based on Fuzzy Comprehensive Assessment[J].Value Engineering,2014(1):314-315.
Authors:XU Jian
Institution:XU Jian (Navy Station in Shenyang Military Representative Office on Engine, Shenyang 110043, China)
Abstract:Ranking of risk factors of evaluation results has been done based on fuzzy comprehensive assessment. Application of weapon system development schedule risk is explored by this method, which can distinguish and solve the high-risk issues and provide a reference to select the risk points of weapon system manufacturing environment.
Keywords:fuzzy comprehensive assessment  development schedule  risk evaluation  weapon system
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号