首页 | 本学科首页   官方微博 | 高级检索  
     

高坝洲水电厂2号机组同期回路改造
引用本文:杨湘渝,程泽斌,YANG Xiangyü,CHENG Zebin. 高坝洲水电厂2号机组同期回路改造[J]. 湖北水力发电, 2007, 0(1): 47-50,56
作者姓名:杨湘渝  程泽斌  YANG Xiangyü  CHENG Zebin
作者单位:湖北清江水电开发有限责任公司,湖北宜昌443000
摘    要:介绍了高坝洲水电厂一次主接线改造后2号发电机组同期回路改造的情况.

关 键 词:一次主接线  同期  改造  自动准同期
文章编号:1671-3354(2007)01-047-04
修稿时间:2006-03-20

Reform of synchronous circuit of No.2 hydrogenerating set of Gaobazou Hydropower Plant
CHENG Zebin. Reform of synchronous circuit of No.2 hydrogenerating set of Gaobazou Hydropower Plant[J]. Hubei Water Power, 2007, 0(1): 47-50,56
Authors:CHENG Zebin
Affiliation:Hubei Qingiiang Hydropower Development Co., Ltd, Yichang 443000, China
Abstract:Following after the reform of primary connection circuit of Gaobazhou hydropower plant, the synchronous circuit of No. 2 hydrogenerating set is reformed appropriatly, the detail about it is described.
Keywords:primary connection circuit   synchronizing   reform   auto-precise synchronizing
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号