大唐公司开远电厂#1机组发电机静子吊装施工方法
引用本文:李永波.大唐公司开远电厂#1机组发电机静子吊装施工方法[J].价值工程,2011,30(35):49-50.
作者姓名:李永波
作者单位:云南省火电建设公司,昆明,650032
摘    要:大唐公司开远电厂#1机组是云南省安装的首台由哈尔滨电机厂生产的300MW水-氢-氢发电机组。本次静子吊装作业采用新方法,解决了旧方法施工中存在静子就位调平、找正困难,耗时过长,以及汽机厂房预留屋顶大开口的弊端。为今后火电施工中发电机静子吊装方案的编写提供了重要的参考价值。

关 键 词:发电机  静子吊装  施工方法  参考价值

Way of Hoisting Stator of No.1 Generator Set in Kaiyuan Power Plant of Datang Company
Li Yongbo.Way of Hoisting Stator of No.1 Generator Set in Kaiyuan Power Plant of Datang Company[J].Value Engineering,2011,30(35):49-50.
Authors:Li Yongbo
Affiliation:Li Yongbo (Yunnan Thermal Power Construction Company,Kunming 650032,China)
Abstract:No.1 generator set in Kaiyuan Power Plant of Datang Company is the first 300MW water-hydrogen-hydrogen generator set manufactured by Harbin Motor Factory in Yunnan province.The stator hoisting operation adapts the new method,and solves the problems in the past hoisting method,such as difficult leveling and alignment,time consuming,and large reserved hole on the plant roof.The new hoisting method provides reference for future stator hoisting program.
Keywords:generator  stator lifting  construction method  reference value  