首页 | 本学科首页   官方微博 | 高级检索  
     

来宾火电B厂水泵房取水头与隧道连接处的施工及堵漏处理
引用本文:艾承辉,黎创文. 来宾火电B厂水泵房取水头与隧道连接处的施工及堵漏处理[J]. 广西电业, 2001, 0(1): 38-40
作者姓名:艾承辉  黎创文
作者单位:广西水电工程局基础工程公司,
摘    要:在来宾火电 B厂水泵房取水头与隧道连接处的施工过程中 ,用严谨的科学态度对渗漏检查试验分析及采取有针对性的手段进行堵漏处理 ,具广泛性和实用价值 ,对其它相应的堵漏工程颇具有借鉴之意义。本工程一次性快速堵漏成功 ,得到了外国专家高度评价

关 键 词:取水头  渗漏  钻孔  灌浆  压力  速凝剂  来宾火电B厂
修稿时间:2000-08-03

Construction and Leakage Treatment of Connection Between WaterIntake of Water Pump House and the Tunnel in Laibin B Power Plant
AI Cheng-hui,LI Chuang-wen. Construction and Leakage Treatment of Connection Between WaterIntake of Water Pump House and the Tunnel in Laibin B Power Plant[J]. , 2001, 0(1): 38-40
Authors:AI Cheng-hui  LI Chuang-wen
Abstract:During the construction of connection between water intake of water pump house and the tunnel, leakageinspection is carried out with rigorous scientism and corresponding measures are taken to treat the leakage in theconnection. As a practical leakage treatment, it can be learned and widely used by other similar projects. Foreignexperts speak highly of this quick and successful leakage treatment.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号