首页 | 本学科首页   官方微博 | 高级检索  
     

关于可靠性增长试验计划曲线的绘制
引用本文:李进卫,田振校. 关于可靠性增长试验计划曲线的绘制[J]. 价值工程, 2008, 27(10)
作者姓名:李进卫  田振校
作者单位:中船重工第七一三研究所质量部,郑州,450015;中船重工第七一三研究所质量部,郑州,450015
摘    要:计划增长曲线是编制可靠性增长计划的一个重要工具,是确保可靠性增长满足要求的速率进展的一个重要因素。描述了对可靠性增长试验计划曲线绘制方法,包括增长目标确定、计划曲线起始点的确定、增长率确定、总试验时间确定等。

关 键 词:可靠性增长试验  可靠性增长试验计划曲线  杜安模型

To Protract on the Planning Curve of Reliability Growth Test
LI Jin-wei,TIAN Zhen-xiao. To Protract on the Planning Curve of Reliability Growth Test[J]. Value Engineering, 2008, 27(10)
Authors:LI Jin-wei  TIAN Zhen-xiao
Abstract:The planned growth curve is an important tool to plan the Reliability growth.It is the important staple factors to insure reliability growth satisfy the request.This article describes the method to protract the reliability planned growth test curve,including plan of the growth aim,the confirming of the state point of the planned growth test curve,and the confirming of the increase rate,as well as the confirming of the total test time.
Keywords:reliability growth test  Planning Curve of Reliability Growth Test  Duane model  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号