小湾工程施工总进度工期研究
引用本文:谢培忠.小湾工程施工总进度工期研究[J].云南水力发电,1998,14(4):60-63.
作者姓名:谢培忠
作者单位:国家电力公司昆明勘测设计研究院
摘    要:小湾水电站是澜沧江中、下游梯级开发的关键工程,混凝土双曲拱坝高达292m,地下厂房总装机容量4200MW,多年平均年发电量188.9亿kWh,工程规模宏伟、效益巨大、技术复杂。本文根据初步设计报告和电力部、云南省联合组织的审查会意见,对小湾工程施工总进度工期论证情况作扼要介绍。

关 键 词:小湾水电站  工期论证  施工进度

Study of General Construction Schedule for Xiaowan Hydropower project
Xie,Peizhong.Study of General Construction Schedule for Xiaowan Hydropower project[J].Yunnan Water Power,1998,14(4):60-63.
Authors:Xie  Peizhong
Institution:Kunming Hydroelectric Investigation Design and Research Institute under State Power Corporation Kunming 650051
Abstract:The Xiaowan Hydropower Project is a key project in the cascade hydropower developments along the middle and lower reaches of the lancang river basin, which has a double _curvature arch dam, 292m high and an underground powerhouse with a total installed capacity of 4200MW and an average annual energy output of 18.89TWh,and is characterized by being magnificent in size, great in benefits and complicated in technique This paper gives a brief inrtoduction to the justification of its general construction schedule according to its feasibility study report and the joint review comments on the report of the Ministry of Electric Power and Yunnan Province.
Keywords:Xiaowan Hydropwwer Project    Justification of construction period  general construction schedule