摘    要:本文重点介绍乌江渡水电站运行中的三个问题:即分析钢筋混凝土内的应力分布、非荷载应力的概念和计算方法,讨论影响坝体应力的因素和下游河床冲刷的情况。文中以原型观测资料为依据,对电站运行工况进行讨论分析,可供设计和施工参考。

关 键 词:钢筋混凝土  非荷载应力  坝体应力  河床冲刷

Operation Information Feedback of Wujiangdu Hydroelectric Plant (Continuation)
Shao Naichen.Operation Information Feedback of Wujiangdu Hydroelectric Plant (Continuation)[J].Design of Hydroelectric Power Station,1992(4).
Authors:Shao Naichen
Institution:Shao Naichen
Abstract:The paper discusses emphatically three problems in operation of Wujiangdu Hy- droelectric Plant:1. the stress distribution in steel reinforced concrete, conception and calcula- tion method of the non-load stress, 2. the factors influencing dam stress, 3. the downstream river bed scour. The plant operation mode is analysed on the basis of prototype observation data and may be used for reference in design and construction.
Keywords:steel reinforced concrete  non-load stress  dam stress  river bed scour