采用倒装施工技术改造脱硫吸收塔
引用本文:熊学云. 采用倒装施工技术改造脱硫吸收塔[J]. 中国资源综合利用, 2011, 29(12): 44-47
作者姓名:熊学云
作者单位:中电投远达环保工程有限公司,重庆,401122
摘    要:在燃煤电厂烟气脱硫系统无法满足排放要求时,需要对其进行增容改造。介绍某电厂300 MW机组脱硫系统改造方案中,吸收塔壳体倒装施工新工艺,为今后同类工程提供借鉴。

关 键 词:燃煤锅炉  脱硫  改造  吸收塔

Application of Reverse Construction Technique in the Modification of Desulfurization Absorption Tower
Xiong Xueyun. Application of Reverse Construction Technique in the Modification of Desulfurization Absorption Tower[J]. China Resources Comprehensive Utilization, 2011, 29(12): 44-47
Authors:Xiong Xueyun
Affiliation:Xiong Xueyun(CPI Yuanda Environmental Protection Engineering Co.,Ltd,Chongqing 401122,China)
Abstract:Flue gas desulfurization system of coal-fired power plant can't meet the requirement,and it need to discharge expanded transformation.Based on the introduction of a certain power plant desulphurization system renovation plan 300 MW unit,the absorption tower mainly introduced new construction technology,which provide reference for similar projects in the future.
Keywords:coal boiler  desulfurization  modification  absorption tower  