首页 | 本学科首页   官方微博 | 高级检索  
     检索      

山西省小浪底引黄工程地下泵站设计
引用本文:秦国强.山西省小浪底引黄工程地下泵站设计[J].山西水利科技,2012(1):27-28.
作者姓名:秦国强
作者单位:山西省水利水电勘测设计研究院 山西太原030024
摘    要:小浪底引黄工程是山西省“十二五”大水网规划中的重点水利工程.文中简要地介绍了该工程地下泵站的设计规模、总体布置、调压井、岩壁吊车梁、电缆井、地下厂房的防渗、排水、防潮的设计思路和要点.

关 键 词:地下泵站  总体布置  调压井  吊车梁  电缆井  防渗  排水  防潮

Design of Underground Pumping Station of Xiaolangdi Yellow River Diversion Project of Shanxi Province
QIN Guo-qiang.Design of Underground Pumping Station of Xiaolangdi Yellow River Diversion Project of Shanxi Province[J].Shanxi Hydrotechnics,2012(1):27-28.
Authors:QIN Guo-qiang
Institution:QIN Guo-qiang
Abstract:Xiaolangdi Yellow River Project is one of the key hydraulic projects in large water network planning during the period of Twelfth Five-years Planning in Shanxi Province.The paper briefly introduces the design scale of this project,its general layout,its design thinking and main points of its surge shaft,cable shaft,crane beam on rock wall,seepage prevention,drainage,and damp proof of underground pumping house etc.
Keywords:underground pumping station  general layout  surge shaft  crane beam  cable shaft  seepage prevention  drainage  damp proof
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号