首页 | 本学科首页   官方微博 | 高级检索  
     

谈贺兰山风电场发电五期工程电气接入布局
引用本文:刘立功. 谈贺兰山风电场发电五期工程电气接入布局[J]. 中小企业科技, 2011, 0(5)
作者姓名:刘立功
作者单位:宁夏发电集团贺兰山风力发电厂;
摘    要:文章结合宁夏发电集团贺兰山风力发电场五期工程电气接入系统布局情况,叙述了风电场建设过程中的接入布局方式、电气主接线、主要电气设备、过电压保护及接地、所用电及照明、电气设备布置。

关 键 词:风力发电  接入布局  风电建设  

On the Electric Access Layout of Fifth Phase Project of Helanshan Wind Power Station
LIU Li-gong. On the Electric Access Layout of Fifth Phase Project of Helanshan Wind Power Station[J]. , 2011, 0(5)
Authors:LIU Li-gong
Affiliation:LIU Li-gong (Helanshan Wind Power Station of Ningxia Power Generation Group,Yinchuan Ningxia 750001)
Abstract:Based on the electric access layout of the fifth phase project of Helanshan Wind Power Station of Ningxia Power Generation Group,the article gives a brief account on its access ways,the main connection,equipment,overvoltage protection and grounding,all electric illumination and electric equipment layout,during it is constructed.
Keywords:wind power generation  access layout  wind power construction  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号