首页 | 本学科首页   官方微博 | 高级检索  
     

仁丽线新木光村特大桥空心墩施工
引用本文:纪鹏飞. 仁丽线新木光村特大桥空心墩施工[J]. 中小企业科技, 2011, 0(2)
作者姓名:纪鹏飞
作者单位:中铁二十五局集团柳州铁路工程有限公司;
摘    要:文章结合仁丽线新木光村特大桥的具体施工实例,详细介绍了变坡空心高墩模板设计、模板倒用、砼浇筑等施工工艺及方法,为今后类似工程的施工提供参考。

关 键 词:空心墩  高墩  整体钢模板  施工方法  

The Construction of Hollow Pier of the Super-large Bridge at Xinmuguang Village of Renli Line
JI Peng-fei. The Construction of Hollow Pier of the Super-large Bridge at Xinmuguang Village of Renli Line[J]. , 2011, 0(2)
Authors:JI Peng-fei
Affiliation:JI Peng-fei (China Railway No.25 Liuzhou Railway Engineering Co.,Ltd.,Liuzhou Guangxi 545007)
Abstract:Based on the concrete construction example at Xinmuguang Village of Renli Line,the article introduces the design of hollow pier template at grade change point,and some technical methods,such as template reserve application and concrete grounding,for the reference of similar projects.
Keywords:hollow pier  high pier  whole steel template  construction methods  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号