非直接开挖机械掘进方式在变电站接地网施工中的应用
引用本文:韦武群. 非直接开挖机械掘进方式在变电站接地网施工中的应用[J]. 中小企业科技, 2011, 0(18)
作者姓名:韦武群
作者单位:广西河池水利电力勘测设计研究院;
摘    要:通过对实际工作中遇到的变电站接地系统施工实例进行分析,提供一种处理接地网电阻降阻的设计、施工方法和建议,供同行参考。

关 键 词:变电站  接地系统  非直接开挖机械掘进方式  

Applications of the Dig-in Ways of Non-direct Excavation Machine in the Construction of Substation Grounding Network
WEI Wu-qun. Applications of the Dig-in Ways of Non-direct Excavation Machine in the Construction of Substation Grounding Network[J]. , 2011, 0(18)
Authors:WEI Wu-qun
Affiliation:WEI Wu-qun (Guangxi Hechi Water Conservancy & Electric Power Survey & Design Institute,Hechi Guangxi 547000)
Abstract:The paper analyzes the construction cases of substation grounding network system in practice,putting forward the design that deals with the resistance and reduces it,and gives the related construction methods and suggestions,for the reference to the peers.
Keywords:substation  grounding system  dig-in ways of non-direct excavation machine  