谈铁路施工造价管理的几点措施 |
| |
引用本文: | 韦晓.谈铁路施工造价管理的几点措施[J].企业科技与发展,2009(2):89-90. |
| |
作者姓名: | 韦晓 |
| |
作者单位: | 中铁二十五局集团柳州铁路工程有限公司,广西柳州545007 |
| |
摘 要: | 文章针对铁路建筑市场施工企业利润空间越来越小的现状,从工程造价管理的角度,提出了加强施工前和施工中造价管理的相关措施,以提高施工企业的经济效益和管理水平。
|
关 键 词: | 施工准备阶段 施工阶段 造价管理 措施 |
On Some Measures for Cost Management of Railway Construction |
| |
Authors: | WEI Xiao |
| |
Institution: | WEI Xiao (China Railway 25th Group Liuzhou Railway Engineering Co., Ltd., Liuzhou Guangxi 545007) |
| |
Abstract: | From the perspective of cost management, the article proposes the measures for strengthening the cost management before and after construction, based on the status quo that the profitability in railway construction market is increasingly declining, as part of the efforts to win more economic returns and to improve the management in construction enterprises. |
| |
Keywords: | preparatory stage job practice stage cost management measures |
本文献已被 维普 等数据库收录! |