凤亭河水电站出线临时变更探讨
引用本文:余冬梅. 凤亭河水电站出线临时变更探讨[J]. 企业科技与发展, 2009, 0(10): 159-160,163
作者姓名:余冬梅
作者单位:广西水利厅凤亭河水库管理处,广西南宁530232
摘    要:风亭河水电站外部网架不配套,将严重影响电站的后期建设和投产运行。为此,通过变更电站出线方式,利用现有的网架条件,最终实现电站提前投产。投产后,电站安全、经济运行,经济效益明显提高。

关 键 词:电站出线  变更  经济效益

A Study on Temporary Changes of Outgoing Lines at Fengting River Hydropower Station
YU Dong-mei. A Study on Temporary Changes of Outgoing Lines at Fengting River Hydropower Station[J]. , 2009, 0(10): 159-160,163
Authors:YU Dong-mei
Affiliation:YU Dong-mei (Fengting River Reservoir Adrministration Office of Guangxi Water Resources, Nanning Guangxi 530232)
Abstract:The lack of a set of external net stands at Fengting River Hydropower Station, would seriously effects its later engineering schedules and the operation. In this case, by changing the ways of its outgoing lines and using the existing net stands, it could put into operation in advance finally. After its operation, the station shall be operated safely and economicaUy and improve its own economic returns.
Keywords:outgoing lines  change  economic returns