首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Derivation of confidence intervals of service measures in a base-stock inventory control system with low-frequent demand
Authors:Christian Larsen
Institution:Centre for Operations Research Applications in Logistics, Department of Business Studies, Aarhus School of Business, Aarhus University, Fuglesangs Allé 4, DK-8210 Aarhus V, Denmark
Abstract:We explore a base-stock system with backlogging where the demand process is a compound renewal process and the compound element is a delayed geometric distribution. For this setting it holds that the long-run average service measures order fill rate (OFR) and volume fill rate (VFR) are equal in values. However, though equal ex ante one will ex post observe differences as actual sample paths are different. By including a low-frequency assumption in the model, we are able to derive mathematical expressions of the confidence intervals one will get if OFR and VFR are estimated in a simulation using the regenerative method. Through numerical examples we show that of the two service measures it is OFR that in general can be estimated most accurately. However, simulation results show that the opposite conclusion holds if we instead consider finite-horizon service measures, namely per-cycle variants of OFR and VFR.
Keywords:Inventory control  Base-stock systems  Confidence intervals of service measures
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号