首页 | 本学科首页   官方微博 | 高级检索  
     

IRP/DSM方法及其应用
引用本文:章树荣. IRP/DSM方法及其应用[J]. 石油化工技术经济, 2000, 16(2): 59-62
作者姓名:章树荣
作者单位:上海科技情报研究所!200031
摘    要:实施IRP/DSM可以节约投资,降低负荷增长率,通过与传统电力规划的比较,IRP能使电力需求分配更趋合理,在IRP方法的应用中,DSM的核心主要表现在针对终端用电部位及主要用电设施提高其电能的利用率和如何加强电力的负荷管理,提高 用生和有效性。

关 键 词:综合资源规划 电力规划方法 IRP DSM

The IRP/DSM Method and Its Application
Zhang Shurong. The IRP/DSM Method and Its Application[J]. Techno-Economics in Petrochemicals, 2000, 16(2): 59-62
Authors:Zhang Shurong
Affiliation:Shanghai Institute of Scientific and Technological Information
Abstract:To implementing Integrated Resource Planning/Demand Side Management(IRP/DSM) may economize on investment and decrease the load growth rate Through comparison with traditional electric power programming method, IRP can make the distribution on power demands move to rational In the application of IRP method, the core of DSM aims at the terminal client and the major facilities to escalate the power utilization and enhance the power load management,in order to raise the nationality and effectiveness in power consumption
Keywords:IRP/DSM   effect   evaluation method   application  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号