首页 | 本学科首页   官方微博 | 高级检索  
     检索      

崇左市江州区派也水库除险加固工程分析
引用本文:施华超.崇左市江州区派也水库除险加固工程分析[J].企业科技与发展,2012(16):75-77.
作者姓名:施华超
作者单位:广西润宏水利水电勘测设计有限公司,广西 南宁 530007
摘    要:崇左市江州区派也水库于1957年11月兴建,1958年3月竣工。派也水库为小(2)型水库,以灌溉为主兼以养鱼,水库设计灌溉面积为62.97 hm~2,实际灌溉面积为62,97 hm~2。水库危及下游居民约4 000人的生命财产、62.97 hm~2耕地的安全,因此时该水库进行除险加固很必要。

关 键 词:崇左市江州区  派也水库  除险加固工程  分析

An Analysis of Danger Elimination and Reinforcement Project of Paiye Reservoir in Jiangzhou District of Chongzuo
Authors:SHI Hua-chao
Institution:SHI Hua-chao (Guangxi Runhong Water Resource and Power Survey Design Co.,Ltd.,Nanning Guangxi 530007)
Abstract:Paiye reservoir in Jiangzhou district of Chongzuo was built in November 1957 and completed in March 1958.As a small—sized reservoir,the reservoir has been mainly utilized to irrigation and fish farming as well.As planned,the water could be dawn into 62.97 hm~2 irrigation area,but the actual one is 62.97 hm~2.Therefore,it is necessary to harness the reservoir, for it has hazarded more than 4 000 people’s life and property and 62.97 hm~2 farmland.
Keywords:Jiangzhou district of Chongzuo  Paiye reservoir  danger elimination and reinforcement project  analysis
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号