枕头坝电站大型轴流转桨机组快速装机对标研究
引用本文:柯剑.枕头坝电站大型轴流转桨机组快速装机对标研究[J].人民长江,2012,43(14):88-90.
作者姓名:柯剑
作者单位:国电大渡河枕头坝水电建设有限公司,四川乐山,614700
摘    要:为了实现枕头坝一级水电站首台机快速装机并提前投产发电的目标,采用对标管理方式,以深溪沟水电站的快速装机技术参照体系,提出了枕头坝电站轴流转桨机的具体装机措施。介绍了深溪沟电站机组各主要部件的具体安装工序,并对安装过程中所遇到的问题和相应的处理措施进行了总结。在此基础上提出,枕头坝一级水电站必须采用构建强有力的组织协调机构、紧抓机组安装关键线路和确保设备图纸及时供应等措施,加速推进机组安装进程,以期实现提前投产发电的目标。

关 键 词:轴流转桨式  水轮发电机组  装机进度  对标管理  深溪沟电站  枕头坝电站

Benchmarking study of quick installation of large Kaplan turbine of Zhentouba Hydropower Station
KE Jian.Benchmarking study of quick installation of large Kaplan turbine of Zhentouba Hydropower Station[J].Yangtze River,2012,43(14):88-90.
Authors:KE Jian
Institution:KE Jian(Zhentouba Branch of Guodian Dadu River Hydropower Development Co.,Ltd.,Leshan 614700,China)
Abstract:In order to realize the quick installation of large Kaplan turbine of Zhentouba Hydropower Station and power generation in advance,the benchmarking management mode is adopted.The quick installation of Shenxigou Hydropower Station in the same basin is taken as reference and the specific measures for installing the large Kaplan turbine of Zhentouba Hydropower Station are proposed.The installation process of the major parts of the turbine of Shenxigou Hydropower Station is introduced;the problems encountered in the process and corresponding measures are summarized.Therefore,it is suggested that in the case of Zhentouba Hydropower Station,the measures should be taken to speed up the installation process and realize the generation in advance,including establishing powerful organization and coordination institutions,focusing on the key links of installation and ensuring the drawings supply timely.
Keywords:Kaplan turbine  hydroelectric generating units  installation progress  benchmarking management  Shenxigou Hydropower Station  Zhentouba Hydropower Station