岩滩水电厂3 6万kVA主变压器水冷却方式的控制特点 |
| |
引用本文: | 唐忠秋.岩滩水电厂3 6万kVA主变压器水冷却方式的控制特点[J].中小企业科技,2011(8):67-69. |
| |
作者姓名: | 唐忠秋 |
| |
作者单位: | 大唐岩滩水力发电有限责任公司,广西南宁530021 |
| |
摘 要: | 岩滩水电厂机组单机容量为30.25万kW·h,主变压器为三相三柱式,容量为36万kVA。因受到当时制造工艺、技术要求以及运输路线的限制,致使大容量的主变压器做成体积小巧的三相三柱式,在运行过程中主变压器油温长期处于高温状态下,特别是夏季大负荷时主变压器油温达到65℃以上,对主变压器的安全运行形成潜在安全隐患。岩滩水电厂的主变压器采用水冷却方式后,主变压器油温降低了近20℃,在夏季最大负荷情况下温度基本保持在47℃左右,达到了改造前的预期目的。
|
关 键 词: | 主变压器 容量 水冷却 温度 负荷 |
Controlling Characters of the Water Cooling of 360 Thousand kVA Main Transformer of Yantan Hydropower Plant |
| |
Authors: | TANG Zhong-qiu |
| |
Institution: | TANG Zhong-qiu (Datang Yantan Hydropower Co.,Ltd.,Nanning Guangxi 530021) |
| |
Abstract: | The single-machine capacity of Yantan Hydropower Plant is 302.5 thousand kW·h,and its main transformer is three- phase three- limb.And its capacity is 360 thousand kVA.The restrains of manufacturing techniques,technical requirements and transformation lines lead that main transformer with large capacity was made into small volume three-phase three- limb.This causes some potential safety hazards,as the main transformer operates in high temperature,especially its oil temperature reaching 65℃above under the large load in summer.After the plant adopted the water cooling method for main transformer,its oil temperature lowered down nearly 20℃,and it can keep the oil temperature about 47℃under the largest load in summer,which has achieved the expected goals. |
| |
Keywords: | main transformer capacity water cooling temperature load |
本文献已被 维普 等数据库收录! |
|