灵东水库平面控制网的投影变形抵偿分析 |
| |
引用本文: | 颜景顺,邱洁.灵东水库平面控制网的投影变形抵偿分析[J].中小企业科技,2011(6):48-50. |
| |
作者姓名: | 颜景顺 邱洁 |
| |
作者单位: | [1]广西水利电力勘测设计研究院,广西南宁530023 [2]南宁市勘测院,广西南守530001 |
| |
摘 要: | 文章结合灵东水库除险加固工程,阐述了应用TrimbleGPS全球定位系统施测、TGO平差软件处理数据的情况,介绍投影变形抵偿计算在工程控制网中的重要性,以及投影变形抵偿解决方案的选择。
|
关 键 词: | 控制网 投影变形 变形抵偿 |
The Analysis of the Projection Distortion Compensation of the Plane Control Network in Lingdong Reservoir |
| |
Authors: | YAN Jing-shun QIU Jie |
| |
Institution: | 1.R&D Institute of Guangxi Water Conservancy & Electric Power Investigation,Nanning Guangxi 530023; 2.Nanning Investigation Institute,Nanning Guangxi 530001) |
| |
Abstract: | Based on the Lingdong Reservoir's risk elimination reinforcement project,the paper elaborates the application of TrimbleGPS and TGO software,introduces the importance of the compensation calculation for distortion of projection in the project's control network and the related solutions. |
| |
Keywords: | control network distortion of projection compensation for distortion |
本文献已被 维普 等数据库收录! |