合同环境下优化路桥项目施工总工期之方法探讨
引用本文:郑树荣. 合同环境下优化路桥项目施工总工期之方法探讨[J]. 科技和产业, 2005, 5(8): 56-59
作者姓名:郑树荣
作者单位:长沙理工大学,长沙,410076
摘    要:在合同环境下,针对某一路桥工程,在一定资源的约束下,可以通过施工作业方式的选择、施工段的排序、施工段数的合理确定、项目总成本和质量控制及经理人素质的提高等方法来进一步缩短和优化路桥项目施工总工期。

关 键 词:路桥项目  总工期  作业方式  施工顺序  施工段  项目总成本  经理素质
文章编号:1671-1807(2005)08-0056-04
修稿时间:2005-05-17

Approach Optimized Discussing of Total Time Limit of Project in Building Highroad and Bridge in Contract Condition
ZHENG Shurong. Approach Optimized Discussing of Total Time Limit of Project in Building Highroad and Bridge in Contract Condition[J]. SCIENCE TECHNOLOGY AND INDUSTRIAL, 2005, 5(8): 56-59
Authors:ZHENG Shurong
Abstract:It is main approach that total time limit of project in building highroad and bridge is optimized,such as selecting construct fashion,optimizing construct sequence,confirming reason sects,controlling total cost and quality,and promoting managers diathesis,aimed at a certain project in building highroad and bridge and resources in contract condition.
Keywords:Highroad and Bridge Project  Total Time Limit  Construct Fashion  Construct Sequence  Construct Sects  Total Cost of Project  Managers Diathesis  