梨园水电站可能最大洪水研究
引用本文:林芸.梨园水电站可能最大洪水研究[J].云南水力发电,2013(6):116-120,129.
作者姓名:林芸
作者单位:中国水电顾问集团昆明勘测设计研究院,云南昆明650051
摘    要:梨园水电站采用可能最大洪水(PMF)作大坝校核标准。以梨园水电站PMF推求为依托,对金沙江中上游流域的PMF进行研究。重点针对其PMP/PMF在前人研究的基础上采用了创新的计算方案及分析方法,求得的PMP/PMF成果较为合理可靠。

关 键 词:可能最大降水(PMP)  横断山区PMF青藏高原相应洪水  天气形势分型  后向轨迹追踪  面雨量计算  净雨同倍比放大

The Study on the Probable Maximum Flood for Construction of the Liyuan Hydropower Project
LIN Yun.The Study on the Probable Maximum Flood for Construction of the Liyuan Hydropower Project[J].Yunnan Water Power,2013(6):116-120,129.
Authors:LIN Yun
Institution:LIN Yun (Kunming Hydroelectric Investigation Design and Research Institute, CHECC, Kunming, Yunnan 650051, China)
Abstract:The Liyuan Hydropower Plant adopts the probable maximum flood(PMF) as the check standard of its dam. The PMF of both the middle and the upstream reaches basins of the Jinsha River was studied based on deriving from PMF of the Liyuan Hydropower Project. The stress is put on adoption of the innovated calculation programs and analysis methods of PMP/PMF on the basis of the studies that the predecessors conducted. The obtained PMP/PMF results are considered reasonable and reliable.
Keywords:probable maximum precipitation(PMP)  PMF in Hengduan mountains  corresponding flood inQinghai--Tibetan Plateau  synoptic pattern  backward trajectory tracking  surface rainfall estimation  netrain compared amplification