首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Participatory planning of industrial R&D activities
Authors:Muhittin Oral  Nükhet Yetis  Riza K Uygur
Institution:1. Muhittin Oral is an Associate Professor of Operations Research and is the Head of then Technology Management Research Group at the Faculté des Sciences de l''Administration, Université Laval, Québec, Canada;2. Prior to that he was the Director of Operational Research Division, Marmara Research Institute, Gebze, Turkey;3. Nükhet Yetis and Riza K. Uygur are research workers and Ph.D. students at the Technical University of Istanbul. They were previously with the Operational Research Division of Marmara Research Institute, Gebze, Turkey
Abstract:This paper summarizes and comments on the methodology actually employed in participatory planning of R&D activities for the iron and steel industry in Turkey. Through an organized collaboration with more than a hundred managers, engineers, experts, and planners: (1) technical, managerial, financial, and social problems that are obstacles to the achievement of predetermined goals for the industry are identified and defined; (2) these problems are formulated as R&D candidate projects; and (3) a set of R&D candidate projects are selected for implementation in the 1980s.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号