首页 | 本学科首页   官方微博 | 高级检索  
     检索      

对河口水库大坝防渗墙施工期观测资料初步分析
引用本文:周晖.对河口水库大坝防渗墙施工期观测资料初步分析[J].大坝与安全,2005(3):46-47,61.
作者姓名:周晖
作者单位:浙江省德清县水利局,浙江,德清,313200
摘    要:本文对应变计的安装埋设方法进行简介,并对对河口水库大坝某槽段混凝土应变计施工期的观测资料进行初步计算分析,为分析评价施工及安全监测提供依据。

关 键 词:对河口水库  防渗墙  柔性钢筋笼  应变  应力
文章编号:1671-1092(2005)03-0046-02
修稿时间:2005年4月13日

Analysis on observed data during construction for impervious core in Duihekou dam
ZHOU Hui.Analysis on observed data during construction for impervious core in Duihekou dam[J].Large Dam & Safety,2005(3):46-47,61.
Authors:ZHOU Hui
Institution:by ZHOU Hui//Water Conservancy Bureau of Deqing County of Zhejiang Province
Abstract:This article briefly introduces the embedding steps of strain metre. The observed data during construction period embedded in concrete in a certain section has been analyzed, which provides the basis for construction evaluation and safety monitoring.
Keywords:Duihekou reservoir  flexible reinforcing cage  impervious core  strain  stress
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号