首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Influence of Trade‐Level Coordination Problems on Project Productivity
Authors:Bon‐Gang Hwang  Xianbo Zhao  Thi Hong Van Do
Institution:1. Department of Building, National University of Singapore, , Singapore;2. School of Engineering and Technology, Central Queensland University, , Sydney, Australia;3. 701 Search Pte Ltd, , Singapore
Abstract:This study aims to investigate the influence of coordination problems in glass and metal curtain wall (GMCW) installation on project productivity in Singapore. Trade‐level coordination problems in GMCW installation were identified through literature review and included in a survey questionnaire. The survey results indicated that, on average, 66.5 days of rework and 52.5 days of waiting resulted from coordination problems, and that “last‐minute changes in design by the client” led to the longest rework and waiting time. Additionally, the rework and waiting time caused by trade‐level coordination problems were correlated with the total rework and waiting time.
Keywords:coordination  productivity  rework  curtain wall
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号