首页 | 本学科首页   官方微博 | 高级检索  
     


Management contribution and the allocation of time in a labor-managed firm
Authors:Benjamin Bental   Uri Ben Zion  Menahem Spiegel
Affiliation:Faculty of Industrial Engineering and Management, Technion, Israel Institute of Technology, Haifa, Israel;Department of Economics, Haifa University, Haifa, Israel
Abstract:The problem of time allocation in a labor-managed firm is considered under a technology specification in which the role of management in the production process is different from that of “ordinary” members. Two allocation schemes are discussed, the egalitarian and the Nash equilibrium. It is shown that in the model discussed the Nash solution brings about an output level that is lower than the Pareto-optimal output level. If the manager seeks employment opportunities outside the cooperative that reflect his success as manager, he increases his time input so that the output of the cooperative and the “ordinary” members' utility levels increase.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号