施工赶工计划优化
引用本文:黄明娜,刘永淞,张向荣. 施工赶工计划优化[J]. 基建优化, 2003, 24(6): 18-19,21
作者姓名:黄明娜  刘永淞  张向荣
作者单位:湘潭大学建工系,湖南,湘潭,411105
摘    要:以原施工网络计划未实施部分构成新的网络计划。针对关键路线上每一个工作不同的时间压缩值建立费用矩阵,采用动态规划法寻找最优赶工方案。文中通过实例表示优化计算的方法与过程。

关 键 词:施工网络计划 动态规划法 矩阵 施工进度计划
文章编号:1000-7717(2003)06-0018-02

Optimization of Construction Scheduling/Adjustment
HUANG Ming-na,LIU Yong-song,ZHANG Xiang-rong. Optimization of Construction Scheduling/Adjustment[J]. Optimization of Capital Construction, 2003, 24(6): 18-19,21
Authors:HUANG Ming-na  LIU Yong-song  ZHANG Xiang-rong
Abstract:This paper discusses a methodology for constructing a new network schedule from the unaccomplisched portion the lagged original schedule.Based on that,a cost matrix is built on the various values of compressed timing for accomplishing each individual work items on oritical paths.An optimal scheduling plan is obtained through operational research applied on the cost matrix.A case study is demonstrated to showcase the whole process.
Keywords:progrmme quickened the race  construction network project  optimization  Dynamic programming