首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Causes of Budget Changes in Building Construction Projects: An Empirical Study in Taiwan
Authors:Jyh-Bin Yang  Chien-Chung Chen
Institution:1. Graduate Institute of Construction Engineering and Management, National Central University, Johngli, Taiwan;2. Chien Kuo Construction Co. Ltd., Taipei, Taiwan
Abstract:Most contractors pay close attention to managing costs due to the direct impacts of cost overruns on their profits. Contractors often cannot effectively control the costs of a construction project due to inaccurate budget allocation, resulting in unsuccessfully forecasting project profits or losses until the project's completion. This study analyzed three real cases and utilized a questionnaire survey to identify the main causes of budget changes in building construction projects in Taiwan. Research results reveal that “client changes,” “inaccurately estimated quantities,” and “unclear drawings and specifications” are the main causes of budget changes. These results provide not only a means of correcting the causes of inaccurate budget allocation but also a measure for project managers to review and control their project costs, which is important to a contractor during a low-profit era.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号