电厂基建期工程造价管理思考
引用本文:刘艳.电厂基建期工程造价管理思考[J].价值工程,2014,33(33):102-103.
作者姓名:刘艳
作者单位:宁夏电投西夏热电有限公司,银川,750021
摘    要:随着市场经济不断发展和完善,电力企业在获得更大发展空间的同时也面临越来越多的挑战,要想实现预期的目标,必须要重视基建期的工程造价管理。文中简单介绍了基建期工程造价的意义,重点分析基建期不同阶段的造价管理。

关 键 词:电厂  基建期工程  造价管理  意义

Engineering Cost Management in the Capital Construction Stage of the Power Plant
LIU Yan.Engineering Cost Management in the Capital Construction Stage of the Power Plant[J].Value Engineering,2014,33(33):102-103.
Authors:LIU Yan
Institution:LIU, Yan ( Xixia Heat and Power Co., Ltd. of Ningxia Power Investment Corporation Yinehuan 750021, China )
Abstract:With the continuous development and improvement of market economy, the power enterprises obtain larger development spaces as well as more and more challenges. If they want to achieve the prospective goals, they must attach great importance to the engineering cost management in the capital construction stage of the project. This paper introduces the significance of the capital construction stage of the project cost, and mainly analyzes the cost management in different stages of the capital construction.
Keywords:power plant  project of capital construction stage  cost management  significance