火力发电厂套简烟囱钢内简施工方案比选
引用本文:解才志. 火力发电厂套简烟囱钢内简施工方案比选[J]. 价值工程, 2010, 29(27): 98-98
作者姓名:解才志
作者单位:四川电力建设三公司,内江641000
摘    要:烟囱钢内筒施工同混凝土外筒施工项目一样,均属于技术上高难度、质量上高标准、安全上高风险的“三高工程”,而如何将钢筒体安全有序、保质保量地将其组合安装到位,则是烟囱内筒工程施工技术的关键和难点所在,本文重点围绕钢内筒的施工方案选择,分析其安装方案的优劣,并结合工程施工实际,阐明方案的优选。

关 键 词:火电  烟囱  钢内筒  技术  方案

Selection and Comparison of Tube-in-tube Chimney Schemes
Xie Caizhi. Selection and Comparison of Tube-in-tube Chimney Schemes[J]. Value Engineering, 2010, 29(27): 98-98
Authors:Xie Caizhi
Affiliation:Xie Caizhi (Sichuan Electric Power Construction No.3 Co., Neijiang 641000, China )
Abstract:The construction of tube-in-tube chimney is the same as the outer tube with concrete construction projects, both are technically difficult and with high standards of quality, security, high-risk "three high-Project", and how to install steel cylinder safely and orderly with good quantity is the key and difficult problem of the tube chimney construction technology , this paper focuses around the steel tube construction scheme selection, analyzes the pros and cons of their installation and combined with construction engineering practice, the optimal scheme selection is described.
Keywords:thermal power  chimney  steel tube  technology  programs