首页 | 本学科首页   官方微博 | 高级检索  
     检索      

洋山港南北汊道水体和悬沙输运变化
引用本文:英晓明,孔亚珍.洋山港南北汊道水体和悬沙输运变化[J].泥沙研究,2012(4):58-62.
作者姓名:英晓明  孔亚珍
作者单位:1. 华东师范大学河口海岸学国家重点实验室,上海200062;国家海洋局南海海洋工程勘察与环境研究院,广东广州510300
2. 华东师范大学河口海岸学国家重点实验室,上海,200062
基金项目:海洋公益性行业科研专项经费资助
摘    要:汊道封堵是洋山港建设的规划方案之一,是后续码头建设的基础工程,其实施也是对港区水动力变化和海床冲淤演变产生影响的主要工程。迄今为止,港区北部颗珠山-小洋山汊道和南部双连山-大山塘汊道及大山塘-大洋山汊道保持畅通。这几个汊道是否封堵一度成为热点问题。本文通过通量分析方法,分析汊道位置水沙输运年际变化。结果表明,颗珠山汊道单宽净输沙通量逐年增强,保留颗珠山汊道是必要的。

关 键 词:水沙长期输运速度  汊道  洋山港

Variation of water and suspended sediment transport in north and south inlets of Yangshan Harbor
YING Xiao-ming , KONG Ya-zhen.Variation of water and suspended sediment transport in north and south inlets of Yangshan Harbor[J].Journal of Sediment Research,2012(4):58-62.
Authors:YING Xiao-ming  KONG Ya-zhen
Institution:1(1.State Key Laboratory of Estuarine and Coastal Research,East China Normal University,Shanghai 200062,China; 2.South China Sea Marine Engineering and Environment Institute,State Oceanic Administration,Guangzhou 510300,China)
Abstract:Inlet closure is one of the layouts of the Yangshan Harbor Project,the fundamental engineering for port building,and its completion is a primary contribution to hydrodynamic and sea bed accretion/erosion change.So far,the inlets between Kezhushan Island and Xiaoyangshan Island in north,between Shuanglianshan Island and Dashantang Island and between Dashantang Island and Dayangshan Island in south remain open.Whether closing these inlets has ever been a hot issue.The paper analyses the yearly variation of water and suspended sediment transport based on flux analysis.The result shows that it is essential to remain the inlet between Kezhushan Island and Xiaoyangshan Island open because the net suspended sediment transport out of the harbor per unit width in normal direction increases with year.
Keywords:residual transport velocity  water and suspended sediment  inlet  Yangshan Harbor
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号