首页 | 本学科首页   官方微博 | 高级检索  
     检索      

南水北调东线睢宁二站中高扬程水泵机组选型设计
作者姓名:孙飞  曹莉莉  楚轩  伍贻芬  黄健
作者单位:江苏省骆运水利工程管理处,江苏宿迁,223800
摘    要:睢宁二站是南水北调东线一期工程江苏省境内第五梯级提水泵站,为大型Ⅰ等、中高扬程水利工程,同时扬程和特征参数变幅较大,运行工况复杂,技术难度较高.结合工程特点,通过水力模型的比对、叶片调节方式的遴选、流道形式及断流方式的计算,最终选定导叶式混流泵为合理的机组类型,配套肘型进水、虹吸出水,可有效加大机组容量,提高水泵调节范围,优化运行方式.对该工程和南水北调工程建设及后期运行具有一定的参考价值.

关 键 词:南水北调东线  睢宁二站  中高扬程  机组选型

Design of Medium High-lift Motor and Pump of Suining Second Pumping Station in the East Line of South-to-North Water Diversion Project
Authors:SUN Fei  CAO Li-li  CHU Xuan  WU Yi-fen  HUANG Jian
Institution:SUN Fei,CAO Li-li,CHU Xuan,WU Yi-fen,HUANG Jian(Jiangsu Province Luoyun Water conservancy Management Department,Suqian 223800,China)
Abstract:Suining Second Pumping Station is a water pump station of the fifth step,which is the first phase of the east line of South-to-North Water Diversion Project in Jiangsu Province.It is a large project of first-class and medium high-lift,and complex under running conditions and difficult in technology,and its characteristic parameters often change in large scale.In this article,combining the project characteristics,through comparing the hydraulic model,selecting the vane adjustment method and calculating the c...
Keywords:the east line of South-to-North Water Diversion Project  Suining Second Pumping Station  medium high-lift  the type of motor and pump  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号