项目管理中最低成本加快方法的人机对话模型及算法设计
引用本文:周远成,牛亚平,张立辉,杨力俊.项目管理中最低成本加快方法的人机对话模型及算法设计[J].价值工程,2003(Z1):126-128.
作者姓名:周远成  牛亚平  张立辉  杨力俊
作者单位:华北电力大学工商管理学院,北京,102206
摘    要:分析传统的最低成本加快方法在实际应用中的不足,提出一种新的最低成本加快方法----人机对话模式与相应的算法。

关 键 词:人机对话  最低成本加快  关键网络  截集  主关键路线  次关键路线

AMan-Machine Interaction Model and Its Algorithm for Compression of Time at Least Cost in Project Management
Zhou Yuancheng,Niu Yaping,Zhang Lihui,Yang Lijun.AMan-Machine Interaction Model and Its Algorithm for Compression of Time at Least Cost in Project Management[J].Value Engineering,2003(Z1):126-128.
Authors:Zhou Yuancheng  Niu Yaping  Zhang Lihui  Yang Lijun
Abstract:The defect of the traditional compression of time at least cost in project management was analyzed in this paper,on this basis a new model for compress time at least cost--man-machine interaction and relative algorithm were put forward.
Keywords:Man-Machine Interaction  Compression of Time at Least Cost  Key Network  Cut Set  Main Critical Path  Sec-ondary Critical Path  