首页 | 本学科首页   官方微博 | 高级检索  
     检索      

二滩水电站发电机转子的焊接和组装技术
引用本文:周关炳,覃春柏.二滩水电站发电机转子的焊接和组装技术[J].贵州水力发电,1998(3).
作者姓名:周关炳  覃春柏
作者单位:中国水利水电第九工程局!贵阳,550008,中国水利水电第九工程局!贵阳,550008
摘    要:论述二滩水电站进口发电机转子的结构性能,组装焊接的工艺和技术特点。借助填隙片,旨在呈4头螺旋线型堆叠磁轭冲片;采用了不同规格的压(拉)紧螺杆;又采用管状电阻加热棒加热磁轭,使之达到应有的膨胀量,加装垫片为预紧量,使磁轭热套于圆盘式结构支架上;并采用了多种组合键调整控制联结等新结构、新工艺、新技术和新标准。

关 键 词:二滩水电站  发电机转子  结构  组焊工艺  螺旋线型堆叠磁轭  磁轭热打键

Welding And Assembling of Generator Runner of Ertan Hydropower Station
Zhou Guanbing, Qin Chunbai.Welding And Assembling of Generator Runner of Ertan Hydropower Station[J].Guizhou Water Power,1998(3).
Authors:Zhou Guanbing  Qin Chunbai
Abstract:The structural features, assembly welding process and its technology features of importedgenerator runner of Ertan Hydropower Station are de8Cribed here. In welding and assembling some newstructures, new process, new technology and new standards were applied.
Keywords:Ertan Hydropower Station  Generator runner  assembly welding process  spiral piling upyode  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号