首页 | 本学科首页   官方微博 | 高级检索  
     检索      

141m空心薄壁墩液压爬模施工技术
引用本文:刘美良.141m空心薄壁墩液压爬模施工技术[J].价值工程,2014(9):103-105.
作者姓名:刘美良
作者单位:中铁十四局集团第三工程有限公司,兖州272100
摘    要:本文结合某高速黄河特大桥141米高主墩的施工,介绍了液压爬模系统及爬模施工工艺在薄壁高墩建设中的应用,为今后高墩的施工积累经验。

关 键 词:薄壁高墩  爬模  施工技术

141m Hollow Thin-walled Pier Hydraulic Climbing Form Construction Technology
LIU Mei-liang.141m Hollow Thin-walled Pier Hydraulic Climbing Form Construction Technology[J].Value Engineering,2014(9):103-105.
Authors:LIU Mei-liang
Institution:LIU Mei-liang (China Railway 14th Bureau Group 3rd Engineering Co., Ltd., Yanzhou 272100, China)
Abstract:Combined with the construction of a high speed Yellow River grand bridge 141m main pier, this paper introduces the hydraulic climbing form system and the application of climbing form construction technology in the thin-wall high pier construction, which provides reference for high pier construction in the future.
Keywords:thin-wall high piers  climbing form  construction technology
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号