邕江特大桥水中墩基岩处理施工工艺
引用本文:陈新龙.邕江特大桥水中墩基岩处理施工工艺[J].价值工程,2014(9):72-73.
作者姓名:陈新龙
作者单位:铁道战备舟桥处,齐河251100
摘    要:南宁枢纽工程邕江特大桥临近既有线施工,在水中墩进行"先堰后桩"法施工中,围堰河床基岩的处理中,摒弃常规的水下爆破方法,采用一种简单实用的方法,为我们处理类似问题又多了一个新选项。

关 键 词:既有线  基岩  冲击  水阻力

Construction Technology of Yongjiang Grand Bridge Water Pier Bedrock Treatment
CHEN Xin-long.Construction Technology of Yongjiang Grand Bridge Water Pier Bedrock Treatment[J].Value Engineering,2014(9):72-73.
Authors:CHEN Xin-long
Institution:CHEN Xin-long (Railway Combat Readiness Bateau Bridge Department, Qihe 251100, China)
Abstract:The Yongjiang grand bridge, which is a pivotal project in Nanning is constructed near the existing line. The "weir before pile" method is used in water pier construction. In treatment of cofferdam river bedrock, instead of the conventional underwater blasting method, a simple and practical method is adopted, which provides new options for handling similar problems.
Keywords:existing lines  bedrock  impact  water resistance