首页 | 本学科首页   官方微博 | 高级检索  
     

景电工程梯级泵站运行调度及管理
引用本文:朱延芳. 景电工程梯级泵站运行调度及管理[J]. 价值工程, 2012, 31(26): 108-109
作者姓名:朱延芳
作者单位:景泰川电力提灌管理局,景泰,730400
摘    要:阐述景电工程梯级泵站运行调度的重要性,结合景电工程多年实际运行情况,针对调度工作中存在的一些问题,提出调度管理的任务、制度以及调度的职责和权限、基本依据、任务和要求等。

关 键 词:梯级泵站  调度  管理

Cascade Pump Station Scheduling and Management of Jingtaichuan Electric Power Project
ZHU Yan-fang. Cascade Pump Station Scheduling and Management of Jingtaichuan Electric Power Project[J]. Value Engineering, 2012, 31(26): 108-109
Authors:ZHU Yan-fang
Affiliation:ZHU Yan-fang(Jingtaichuan Electric Power Irrigation Water Extraction Authority,Jingtai 730400,China)
Abstract:The paper elaborated the importance of cascade pumping station operation scheduling of Jingtaichuan Electric Power Project,and put forward the tasks and systems of scheduling management,as well as the scheduling responsibility and authority,the fundamental basis,tasks and requirements by combining with many years of actual operation and according to some problems in scheduling work.
Keywords:cascade pumping station  scheduling  management
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号