变电所二次接线及传动调试方式的探讨
引用本文:翟树峰.变电所二次接线及传动调试方式的探讨[J].价值工程,2011,30(19):31-31.
作者姓名:翟树峰
作者单位:秦皇岛港城电力工程有限公司,秦皇岛,066004
摘    要:变电所施工可分为安装调试两大部分,本文从二次接线、二次传动调试、试验调试三个方面结合自己在长期的电力设施安装调试过程中的一些经验,探讨了变电所电力设施安装调试的方式、方法,供大家参考。

关 键 词:变电所  二次接线  传动调试  试验

Secondary Wiring Method and Drive Adjustment Mode of Substation
Zhai Shufeng.Secondary Wiring Method and Drive Adjustment Mode of Substation[J].Value Engineering,2011,30(19):31-31.
Authors:Zhai Shufeng
Institution:Zhai Shufeng(Qinhuangdao Gangcheng Electric Power Project Co.,Ltd.,Qinhuangdao 066004,China)
Abstract:There are two parts of installation and debug in substation construction.Combining with the author's experience of installation and adjustment of electrical facility,the article discussed way and method of installation and adjustment of electrical facility of substation for reference.
Keywords:substation  secondary wiring  drive adjustment  test  