首页 | 本学科首页   官方微博 | 高级检索  
     检索      

建筑工程项目的质量挣值法研究
引用本文:黄无非.建筑工程项目的质量挣值法研究[J].价值工程,2014(16):67-68.
作者姓名:黄无非
作者单位:杨凌职业技术学院,杨凌712100
摘    要:传统的挣值法主要应用于施工全过程中的进度和成本的管理,而本文通过对挣值法和质量管理集成后,项目管理人员根据质量挣值法的各个指标进行科学的预测,对于施工中可能发生的质量问题及时的纠偏,以保证正常的安全生产,确保施工过程中的施工质量达标。

关 键 词:建设工程项目  质量管理  施工进度  质量挣值法

Research on the Construction Project with Quality Earned Value Method
HUANG Wu-fei.Research on the Construction Project with Quality Earned Value Method[J].Value Engineering,2014(16):67-68.
Authors:HUANG Wu-fei
Institution:HUANG Wu-fei ( Yangling Vocational and Technical College , Yangling 712100, China )
Abstract:Traditional earned value method should be used to progress and cost management in the construction process. But in this paper it based on the earned value method and the integration of quality management, project managers can forecast all of the indicators scientifically. Possible quality problems in construction could be corrected in a timely manner, in order to ensure the normal production and make sure that the quality indicators are reached the mark on construction process.
Keywords:construction project  quality management  construction progress  quality earned value method
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号