宁东电厂厂区混凝土道路裂纹控制
引用本文:郭继新. 宁东电厂厂区混凝土道路裂纹控制[J]. 价值工程, 2014, 0(16): 147-148
作者姓名:郭继新
作者单位:神华国华惠州热电分公司,惠州516082
摘    要:电厂在宁夏宁东的马家滩,属于黄河流域黄土高原干旱草原区,气候干燥,年降水量少而集中,蒸发强烈;道路设计是300厚C30混凝土,分作二次施工,每层厚150mm。控制好混凝土的施工措施,保证道路的整体性。

关 键 词:道路  混凝土  裂缝  环境  措施

Crack Control of Concrete Road in Ningdong Power Plant Factory
GUO Ji-xin. Crack Control of Concrete Road in Ningdong Power Plant Factory[J]. Value Engineering, 2014, 0(16): 147-148
Authors:GUO Ji-xin
Affiliation:GUO Ji-xin ( Shenhua Guohua Huizhou Thermoelectric Branch, Huizhou 516082, China )
Abstract:The power plant is located in Majiatan, Ningdong of Ningxia, which belongs to the Yellow River basin of the loess plateau dry grassland region where the climate is dry, the annual precipitation is little and concentrated, and the evaporation is strong. The road design is 300 thick C30 concrete, and is divided into two construction stages, each layer 150ram. Good control of concrete construction measures are needed to ensure the integrity of the road.
Keywords:road  concrete  crack  environment  measures