钢箱梁顶推施工工艺
引用本文:尹若建.钢箱梁顶推施工工艺[J].价值工程,2010,29(5):41-41.
作者姓名:尹若建
作者单位:铁道战备舟桥处,齐河,251100
摘    要:济南小清河项目难点施工为架设3片钢箱梁(垂直于桥向),每片由5节(沿桥向)钢箱梁组成,共约600吨。采用先轮箱纵移到钢箱梁对应的跨位,再利用自锁爬行顶推小车横移至梁位处,落梁就位(中间9节钢箱梁)。两头的钢箱梁利用大吨位吊车和已经就位好的钢箱梁对接架设。很好地解决了单片整体吊装钢箱梁接头变形影响问题。

关 键 词:轮箱纵移  自锁爬行顶推小车横移  钢箱梁架设

Steel Box Pushing Beam Construction Technology
Yin Ruojian.Steel Box Pushing Beam Construction Technology[J].Value Engineering,2010,29(5):41-41.
Authors:Yin Ruojian
Institution:Railroad Combat Readiness Funabashi Branch/a>;Qihe 251100/a>;China
Abstract:Jinan Xiaoqing difficult construction project is the erection of three steel box girders (perpendicular to the bridge to),each piece is composed of 5(along the bridge to)steel box girders,about 600 tons. A first-round steel box girder box is moved to the corresponding vertical cross-bit,and re-use of self-locking crawling pushing trolleys to move cross-beam is located off the beam in place (nine steel box girders are in the middle). The use of two steel box girder in place large-tonnage cranes and box girde...
Keywords:wheel box vertical shift  self-locking crawling pushing car sliding  steel box girder erection  