首页 | 本学科首页   官方微博 | 高级检索  
     

基于PDCA循环的酒店员工培训体系构建——以A酒店为例
引用本文:傅士芹. 基于PDCA循环的酒店员工培训体系构建——以A酒店为例[J]. 武汉市经济管理干部学院学报, 2014, 0(6): 56-58
作者姓名:傅士芹
作者单位:安徽工商职业学院,安徽合肥231131
摘    要:
A酒店作为一家国际化的五星级酒店,每年在员工培训项目上投入了大量的人力物力和财力,但是培训效果却不尽如人意。本文提出了在员工培训中引入PDCA质量循环机制,构建了基于PDCA的员工培训体系,优化培训项目管理流程,提高酒店的培训效益。

关 键 词:PDCA质量循环机制  培训体系  项目管理

The Construction of Training System of Hotel Staff based on PDCA Cycle ---Taking A Hotel as an Example
FU Shi-qin. The Construction of Training System of Hotel Staff based on PDCA Cycle ---Taking A Hotel as an Example[J]. Journal of Wuhan Economic Administration Cadre's College, 2014, 0(6): 56-58
Authors:FU Shi-qin
Affiliation:FU Shi-qin (Anhui Vocational College of Industry and Commerce,Hefei,Anhui,231131,China)
Abstract:
A hotel, as a five-star international hotel, invested a lot of manpower, material resources and financial resources in staff training each year, but the training effect is not satisfactory. This paper proposes the introduction of PDCA quality cycle mechanism in staff training, builds the staff training system based on PDCA, optimizes training project management process, and improves the efficiency of the hotel's training.
Keywords:PDCA mass circulation mechanism  staff training system  project management
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号