首页 | 本学科首页   官方微博 | 高级检索  
     检索      

工程建设项目设计阶段造价控制
引用本文:许经斌.工程建设项目设计阶段造价控制[J].价值工程,2011,30(6):119-119.
作者姓名:许经斌
作者单位:牡丹江医学院,牡丹江,157011
摘    要:我国的工程建设程序大致可划分为可行性研究阶段、设计阶段、招标投标阶段、施工阶段和竣工结算阶段。工程造价在项目的整个过程中是贯穿始终的。通过分析工程设计阶段与工程总体造价的关系,对工程设计阶段造价失控的原因,提出一些具体的控制措施。

关 键 词:工程建设项目  设计阶段  造价

Engineering Construction Cost Control at Design Stage
Xu Jingbin.Engineering Construction Cost Control at Design Stage[J].Value Engineering,2011,30(6):119-119.
Authors:Xu Jingbin
Institution:Xu Jingbin(Mudanjiang Medical University,Mudanjiang 157011,China)
Abstract:China's engineering construction procedure may roughly be divided into feasibility study phase,design stage,bidding stage,construction stage and completion of settlement stage.The project cost is throughout the project process.Through the analysis of the relationship of engineering design stage and engineering overall cost,some concrete measures of controlling the engineering design stage cost runaway are put forward.
Keywords:engineering construction project  design stage  cost  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号